Erosion Corrosion – Learning from Humber Estuary

January 27, 2009

Muhammad Abduh (abduh@reksolindo.co.id)

On 16 April 2001 a fire and explosion occurred at Humber Refinery following the catastrophic failure of an overhead gas pipe. Investigation was carried by The Competent Authority and the plant operator company by legislative mechanism under Control of Major Hazard (COMAH) Regulation 1999. Humber refinery was one of approximately 1000 major hazard site under this regulation. The competent authority consisted of Health and Safety Executive (HSE) UK and Environment Agency (EA).

p4363

The cause of the piping system failure was the erosion corrosion
of the 6-inches diameter pipe, known P4363, which carried the overhead line from the De-ethanizer (W413) to the heat exchanger (X452) in saturate gas plant (SGP) unit. The failure occurred down stream of a closely water injection point. Examination to thefailed elbow recovered from the damage site showed wall thickness thinning from 7-8 mm to a minimum 0.3 mm. When the pipe failed it burst open catastrophically causing a full bore type of release the pipe contents.

The water injection point was not the original design of the piping system. Water injection to the vapor stream between the top de-ethanizer column and the heat exchanger was addressed to solve the previous problem of salts or hydrates fouling in heat exchanger X452/3. An injection point was created in P4363 by piping water to an existing 1 inches vent point on the pipe without injection quill or dispersal device and made the water entering the pipe as a free jet.

Erosion-Corrosion
There are studies that noted the synergistic effect ofmechanical impingement and electrochemical corrosion result in greater rate of metal loss than the sum of the two mechanism ( S. Zhuo, N. Stack & R.C Newman)

The highest rate of erosion-corrosion occurred in stagnant region, immediately beneath the jet, where the particles impacted the surface at an angle of 90°, This critical erosion-corrosion region in a piping system are found at the outer side of elbow where the fluid impinges the wall directly at an angle 90°.

NACE 34101: Refinery Injection & Process Mixing
Points

One of the generic guidance to overcome the problem of erosion corrosion in refinery process is NACE 34101 which gas already published as recommended practice for the design consideration of  injection system.

RBI Regime was not Effective
This accident also has shown the effect of in-effective implementation of RBI for inspection management. RBI as a comprehensive method shall be supported with complete and adequate data. The ignorance of the operator company for the significant risk contribution of the injection system to the piping were resulted in the failure.

Similar Accidents:

1. Wilmington California United States – October 8,1992
2. North Rhine West Phalia Germany-  December 10,1991
3. Yokkaichi Mie Japan – May 2, 1997
4. Mina Al-Ahmadi Kuwait-  June 25, 2000


Offshore, Platform, and the Videos

June 10, 2008

Piper Alpha 1988

Petrobras P-36

BP Thunderhorse


Gulf of Martaban Pipeline Leaking

June 6, 2008

Muhammad Abduh (abduh137@gmail.com)

Figure showing one of the production Platform in Yetagun Field (Marinerthai)

Subsea pipeline transporting gas from Yetagun and Yedana Field Gulf of Martaban Myanmar to Thailand was reported to have leaking in April 2, 2008 (Irrawaddy, Reuter). The operator company reported that there were two cracks causing ruptures found in the line close to Thailand-Myanmar border. Yetugun field was started up for production in 2000, with 400-500 million cubic feet per day gas production (mmcfd), while Yedana Field with 700 mmcfd two years earlier. Gas from these fields are exported to Thailand through 700 km of pipeline system (~80% subsea pipelines).

The leaking was to said not to disrupt Thailand electricity supply as the gas from these fields account only 15 percent of total consumption. However, largely Thailand industrial gas consumer will be in excess of gas shortage of about 5,800 million cubic feet and moreover owner company to suffer about USD 60,000,000 production lost (at natural gas rate = USD 10 per mmbtu).

-

Field Information (PTTEP, OilOnline)

  • Yadana: Located in the Gulf of Martaban, in blocks M5 and M6, the Yadana offshore project is in the production phase, supplying Thailand with about 600mmcf/d of natural gas through a 409km pipeline, 345km of it subsea, to the Thai-Myanmar border at Ban I Thong. Partners: PTTEPI (25.5%), TotalFinaElf Myanmar (31.2), Unocal Myanmar (28.3%), Myanmar Oil & Gas Enterprise (15%).
  • Yetagun: This field is now in production from Myanmar blocks M12, M13 and M14 in the Gulf of Martaban. A 277km gas pipeline, 210km of it subsea, takes gas from Yetagun to the Thai-Myanmar border at Ban I Thong. In 2002, gas production reached 300mmcf/d. Phase III front-end engineering and design has been completed and construction and installation is under way. Partners: Premier, operator (26.6%), Petronas Carigali (30%), Nippon Oil (14.2%), PTTEPI (14.2%) and Moge (15%).
  • Related Post: Palembang Pipeline Leaking – Aging Pipeline to Raise Risk Exposure